JLRD13 Thermal overload relay
Motion Characteristic: Three-Phase Balance Motion Time
| No | Tiden fan de ynstelstroom (A) | Motion tiid | Start betingst | Ambient temperatuer | ||
| 1 | 1.05 | >2h | Kâlde steat | 20±5°C
| ||
| 2 | 1.2 | <2h | Heat steat | |||
| 3 | 1.5 | <4 min | (Nei de No.l test) | |||
| 4 | 7.2 | 10A | 2s | <63A | Kâlde steat | |
| 10 | 4s | >63A | ||||
Fase-Losing Motion Characteristic
| No | Tiden fan de ynstelstroom (A) | Motion tiid | Start betingst | Ambient temperatuer | |
| Elke twa fazen | In oare faze | ||||
| 1 | 1.0 | 0.9 | >2h | Kâlde steat | 20±5°C |
| 2 | 1.15 | 0 | <2h | Heat steat (Nei de No.l test) | |
Spesifikaasje
| Type | Nûmer | Ynstellingsberik (A) | Foar kontaktor |
|
JLR2-D13
| 1301 | 0.1~0.16 | JLC1-09~32 |
| 1302 | 0.16~0.25 | JLC1-09~32 | |
| 1303 | 0.25~0.4 | JLC1-09~32 | |
| 1304 | 0.4~0.63 | JLC1-09~32 | |
| 1305 | 0.63~1 | JLC1-09~32 | |
| 1306 | 1~1.6 | JLC1-09~32 | |
| 1307 | 1.6~2.5 | JLC1-09~32 | |
| 1308 | 2.5~4 | JLC1-09~32 | |
| 1310 | 4~6 | JLC1-09~32 | |
| 1312 | 5.5~8 | JLC1-09~32 | |
| 1314 | 7~10 | JLC1-09~32 | |
| 1316 | 9~13 | JLC1-09~32 | |
| 1321 | 12~18 | JLC1-09~32 | |
| 1322 | 17~25 | JLC1-32 | |
| JLR2-D23
| 2353 | 23~32 | CJX2-09~32 |
| 2355 | 30~40 | JLC1-09~32 | |
|
JLR2-D33
| 3322 | 17~25 | JLC1-09~32 |
| 3353 | 23~32 | JLC1-09~32 | |
| 3355 | 30~40 | JLC1-09~32 | |
| 3357 | 37~50 | JLC1-09~32 | |
| 3359 | 48~65 | JLC1-09~32 | |
| 3361 | 55~70 | JLC1-09~32 | |
| 3363 | 63~80 | JLC1-09~32 | |
| 3365 | 80~93 | JLC1-95 | |
| JLR2-D43
| 4365 | 80~104 | JLC1-95 |
| 4367 | 95~120 | JLC1-95~115 | |
| 4369 | 110~140 | JLC1-115 |
Skipfeart manier
Troch see, troch loft, troch expressferfierder

BETALING MANIER
Troch T / T, (30% foarôfbetelle en it saldo sil wurde betelle foar ferstjoering), L / C (kredytbrief)
Sertifikaat














